Wastewater & sanitation systems
Phase 1: 6 to 150 PE (population equivalent). Septic tanks and sewage treatment systems, each series with its own sample licence.
Notes
- Illustrative typical section, not to scale.
- D, L and H2 per model schedule. Invert levels (IL): TBC.
- Tank and covers by Lintang Tankworks. Contractor installs.
| Product line | Range |
|---|---|
| PE Bio-Filter septic tankRotomolded HDPE, needs no power | 6–18PE |
| FRP Bio-Filter septic tankFibreglass reinforced polyester, needs no power | 8–30PE |
| LT small sewage treatment systemFRP tank aerated by blowers, also for rent | 40–150PE |
Portfolio concept. Fictional manufacturer, sample data.
PE and FRP tanks, made in Malaysia
Sample company profile. A fictional Malaysian maker for both materials: rotomolded polyethylene and fibreglass reinforced polyester, from household septic tanks to small sewage treatment systems.
Company notesSample
- Dispatch point: Nilai, Negeri Sembilan.
- In-house rotomoulding (PE) and FRP lay-up under one roof.
- Three series: PE Bio-Filter septic tank, FRP Bio-Filter septic tank, LT small sewage treatment system.
- Sample services: PE calculation and SPAN / IWK submission support.
Three sample licences, one for each series
MS 2441-1 and MS 2441-2. For this portfolio concept, the septic tanks and the sewage treatment system each carry a sample product-certification licence to their Malaysian Standard.
| No. | Sample licence | Standard | Series | Since | SPAN ref. |
|---|---|---|---|---|---|
| 1 | SAMPLE-PE-01Sample | MS 2441-1:2012 | PE Bio-Filter septic tank | Sample | Sample |
| 2 | SAMPLE-FRP-02Sample | MS 2441-1:2012 | FRP Bio-Filter septic tank | Sample | Sample |
| 3 | SAMPLE-SSTS-03Sample | MS 2441-2:2014 | LT small sewage treatment system | Sample | Sample |
Licence numbers are sample placeholders for this portfolio concept, not real SIRIM QAS licences.
Submission support from Lintang TankworksSample
- 1PE calculation
Population equivalent worked out for the submission.
- 2SPAN / IWK submission
Sewerage submission services for the tank or treatment system.
- 3Resubmission
Resubmission services when a submission comes back.
Standards and authorities
- SIRIM QAS
- Malaysia's product certification body. MS 2441-1:2012 covers PE and FRP septic tanks, MS 2441-2:2014 covers small sewage treatment systems.
- SPAN
- Septic tanks built to the Malaysian Sewerage Industry Guidelines Volume V and the MS 1228:1991 code of practice.
- IWK
- Malaysia's national sewerage operator; desludging every 2 years is typical.
- EQA
- Environmental Quality Act discharge limits; an LT system is designed to Standard A.
Three series cover 6 to 150 PE with no gap
6 to 150 PE. Up to 30 PE, a bio-filter septic tank treats sewage with no power. Above 30 PE, the LT adds air from a blower. Pick the series by PE first, then by site.
Reading the range
- 31 to 39 PE: use LT-40, the smallest LT model.
- 8 to 18 PE: both bio-filter series fit. FRP adds high flexural strength and 150 mm pipes.
- Not sure of the PE? Lintang Tankworks offers PE calculation and SPAN / IWK submission.
| PE Bio-Filter | FRP Bio-Filter | LT | |
|---|---|---|---|
| PE range | 6–18 | 8–30 | 40–150 |
| Models | 7 | 7 | 8 |
| Process | Anaerobic bio-filter | Anaerobic bio-filter | Aerated, activated sludge |
| Power needed | None | None | Mains, for 2 blowers |
| Material | Rotomolded HDPE | FRP | FRP |
| Pipe size | 100 mm | 150 mm | 150 mm |
| Warranty | 5 years | 5 years | 8 years |
Above 150 PE a full sewage treatment plant is needed. Talk to Lintang Tankworks' engineers.
No pump, no power, no moving parts
PE and FRP Bio-Filter, 6 to 30 PE. Sewage settles in the first zone, then rises through plastic bio-media and leaves by a lower outlet. The flow runs by gravity alone.
Four states of the water
- 1 Raw Enters from the last manhole by the higher pipe and turns down into the settling zone.
- 2 Settled Solids settle in the outer zone. The flow passes under the filter chamber.
- 3 Filtered Rises up through the plastic bio-media: upflow anaerobic filtration.
- 4 Discharged Leaves by the lower pipe to the public drain.
- Power
- None. No lift pump, no moving parts.
- Desludging
- Every 2 years, through the separate settling-zone opening. Refill with water after.
- Tank
- Leakproof. Resists rust and most chemicals in soil and sewage.
Seven light, leakproof tanks for 6 to 18 PE
PE Bio-Filter septic tank, 6 to 18 PE. Rotomolded polyethylene, one horizontal and six vertical models. Light and compact, so they are easy to handle and install where working space is limited.
| Model | Type | PE | DDiameter | LLength | H1Height | H2Water level | Capacity |
|---|---|---|---|---|---|---|---|
| mm | mm | mm | mm | L | |||
| LP-6H | Horizontal | 6 | 1300 | 2550 | 1300 | 1050 | 2930 |
| LP-6V | Vertical | 6 | 1550 | – | 1850 | 1550 | 2920 |
| LP-8 | Vertical | 8 | 1600 | – | 1980 | 1680 | 3380 |
| LP-10 | Vertical | 10 | 1650 | – | 2080 | 1780 | 3810 |
| LP-12 | Vertical | 12 | 1700 | – | 2170 | 1870 | 4240 |
| LP-15 | Vertical | 15 | 1800 | – | 2230 | 1930 | 4910 |
| LP-18 | Vertical | 18 | 1850 | – | 2370 | 2070 | 5560 |
- Pipe
- 100 mm inlet and outlet
- Power
- None. Anaerobic bio-filter, no moving parts.
- Material
- Rotomolded HDPE. Leakproof, resists rust.
- Site
- Suits coastal and high water-table areas.
- Warranty
- 5 years, manufacturing defects. Void if the installation manual is not followed.
- Certified
- MS 2441-1:2012, sample licence SAMPLE-PE-01Sample
High-strength FRP for high water tables and deep burial
8 to 30 PE. The same upflow bio-filter as the PE series: no pump, no power, no moving parts. The fibreglass shell has high flexural strength. FRP takes over above 18 PE, and for deep burial at any PE by Lintang Tankworks' guide rule. On a high water table it is anchored and strapped, as drawn.
Detail notes
- The SS304 straps and the base resist buoyancy from the GWT.
- Fill the tank to TWL before backfilling.
- Invert levels TBC.
| Model | Type | PE | DDia. | LLength | H1Height | H2Water | Cap. |
|---|---|---|---|---|---|---|---|
| mm | mm | mm | mm | L | |||
| LF-8H | Horizontal | 8 | 1500 | 2220 | 1500 | 1200 | 3360 |
| LF-8V | Vertical | 8 | 1650 | – | 1930 | 1580 | 3380 |
| LF-15H | Horizontal | 15 | 1550 | 3010 | 1550 | 1250 | 4910 |
| LF-15V | Vertical | 15 | 1900 | – | 2080 | 1730 | 4910 |
| LF-20V | Vertical | 20 | 2050 | – | 2170 | 1820 | 6010 |
| LF-28H | Horizontal | 28 | 1700 | 3890 | 1700 | 1400 | 7780 |
| LF-30H | Horizontal | 30 | 1700 | 4110 | 1700 | 1400 | 8220 |
H suffix, horizontal V suffix, vertical
- Pipe
- 150 mm inlet and outlet
- Warranty
- 5 years on manufacturing defects
- Licence
- SAMPLE-FRP-02Sample
Aerated treatment designed for Standard A effluent
40 to 150 PE. A pre-fabricated FRP tank in two chambers. A diaphragm blower pushes air through a diffuser to treat the flow.
- RawSewage enters the aerobic reactor tank (ART).
- SettledSolids settle in the lower zone of the ART.
- AeratedAir from the diffuser treats the rising flow.
- ClarifiedThe final settlement tank (FST) clarifies it.
- DischargedTreated effluent leaves the outlet.
- Process
- Upflow activated sludge, aerated
- Blowers
- 2 diaphragm blowers, 1 duty + 1 standby
- Supplied
- Blowers and air diffuser by Lintang Tankworks. The installer fits them.
- Effluent
- Designed for EQA Standard A
- Pipe
- 150 mm inlet and outlet
- Certified
- MS 2441-2:2014, sample licence SAMPLE-SSTS-03Sample
- Warranty
- 8 years
- Rental
- Available for LT 40 to 150 PE
Needs mains power on site to run the blowers.
Only the length changes with PE
LT-40 to LT-150. Every model is 2300 mm wide and 2500 mm high, with water at 1900 mm. Pick the length for your PE. All eight are designed for Standard A, the stricter of the two EQA discharge limits.
| Model | PE | LLength | WWidth | H1Height | H2Water level | Capacity | Length to scale |
|---|---|---|---|---|---|---|---|
| mm | mm | mm | mm | L | 0 to 5400 mm | ||
| LT-40 | 40 | 1600 | 2300 | 2500 | 1900 | 6990 | |
| LT-50 | 50 | 1950 | 2300 | 2500 | 1900 | 8520 | |
| LT-60 | 60 | 2300 | 2300 | 2500 | 1900 | 10050 | |
| LT-75 | 75 | 2800 | 2300 | 2500 | 1900 | 12240 | |
| LT-90 | 90 | 3300 | 2300 | 2500 | 1900 | 14420 | |
| LT-110 | 110 | 4000 | 2300 | 2500 | 1900 | 17480 | |
| LT-130 | 130 | 4700 | 2300 | 2500 | 1900 | 20540 | |
| LT-150 | 150 | 5400 | 2300 | 2500 | 1900 | 23600 |
LT schedule notes
- Invert levels per site: TBC.
- Synthetic sample dimensions: the length holds 900 L plus 150 L per PE, and capacity is W × L × H2 (see docs/SOURCES.md).
| Parameter mg/L unless stated | Standard A LT design | Standard B |
|---|---|---|
| Temperature, °C | 40 | 40 |
| pH value | 6.0–9.0 | 5.5–9.0 |
| BOD5 at 20 °C | 20 | 50 |
| COD | 120 | 200 |
| Suspended solids | 50 | 100 |
| Oil and grease | 5.0 | 10.0 |
| Ammoniacal nitrogen, enclosed water body | 5.0 | 5.0 |
| Ammoniacal nitrogen, river | 10.0 | 20.0 |
| Nitrate-nitrogen, river | 20.0 | 50.0 |
| Nitrate-nitrogen, enclosed water body | 10.0 | 10.0 |
| Phosphorus, enclosed water body | 5.0 | 10.0 |
- Standard A
- Inland waters upstream of a water supply intake (Third Schedule)
- Standard B
- All other inland and Malaysian waters
Enter your PE, get the certified model
6 to 150 PE. Add your site conditions. The sheet picks the smallest certified model that covers your PE and draws it to its real proportions.
Enter a PE to see the certified model.
How the model is chosen
- Up to 18 PE: PE Bio-Filter septic tank.
- 19 to 30 PE: FRP Bio-Filter septic tank.
- Deep burial picks FRP at any PE up to 30, for its flexural strength: Lintang Tankworks' guide rule.
- A high water table suits both bio-filter series, so the model stays the same. Anchor and strap the tank to its base.
- 31 to 150 PE: LT sewage treatment, which needs mains power for its blowers. 31 to 39 PE takes the LT-40.
- Two models at the same PE: vertical for a limited footprint, horizontal for a shallower dig.
- Above 150 PE: a full sewage treatment plant. Talk to Lintang Tankworks' engineers.
Enter 1 to 150 PE to draw it
Install in 7 steps, desludge every 2 years
PE, FRP and LT. Lintang Tankworks supplies the tank. Your contractor installs it in this order. If the installation manual is not followed, the warranty is void.
- Lintang Tankworks supplies
- The tank with its manhole covers. For LT, also two air blowers (1 duty, 1 standby) and the air diffuser.
- Your contractor
- Excavation, base, anchoring, backfill, pipes, slab and manhole necks. For LT, also installs the blowers. Blower housing: by others.
Installation sequence
-
1
Excavate
Dig the pit with 300–600 mm of working space all round the tank.
Item 1 · panel A -
2
Base and anchors
50 mm lean concrete, then a 150 mm grade 30 N base with one layer of BRC-A9. Cast in four Ø12 mm stainless steel hooks.
Items 2–3 · panel B -
3
Set and strap
Lower the tank onto the cured base. Tie the Ø20 mm SS304 strap over it and tighten the turnbuckle.
Items 4–5 · panel C -
4
Fill and backfill
Fill with water to top water level. Backfill with sand (fine sand recommended), compacted in 150 mm layers up to the rim.
Items 6–7 · panel D -
5
Pipes
Compact the backfill at the inlet and outlet. Lay both pipes at a 1:100 fall.
Item 8 · panel E -
6
Slab and necks
Cast a 100 mm 1:2:4 concrete slab with one layer of BRC-A9 and the manhole openings. Build brick sump necks to platform level.
Items 9–10 · panel E -
7
Covers and final fill
Backfill with sand to platform level and fit the manhole covers. Fill the tank with water to full capacity.
Items 11–12 · panel F
Item and panel numbers are illustrative (docs/SOURCES.md). Schematic panels, not to scale; invert levels per site, TBC.
Care
- Desludge every 2 years, in line with IWK servicing.
- Refill the tank with water after every desludging.
- Check for unusual odours between services.
- Installed properly, the tank lasts 10+ years.
LT start-up
- Seed it: fill 1/3 of the capacity with Standard A crude sewage (imported sludge).
- Fill the other 2/3 with water to top water level.
- The blowers need mains power and a weatherproof housing, by others.
Warranty
- PE and FRP
- 5 years
- LT
- 8 years
- Scope
- Manufacturing defects only. Void if the installation manual is not followed.
Send your PE on WhatsApp
Lintang Tankworks sales, Nilai. Ask for a model, a sample certificate or a CAD drawing. Lintang Tankworks also does the PE calculation and the SPAN / IWK submission.
Opens WhatsApp; choose who to send it to (portfolio demo, no sales number).
Put in your message
- The PE, or the building type and size so Lintang Tankworks can calculate it.
- The site location.
- Water table and burial depth, if you know them.
- Whether mains power is on site, for an LT.
- Phone
- Phone on request
- sales@example.com
- Office hours
- Mon–Fri 9:00–17:00, Sat 9:00–13:00
- Dispatch point
- Nilai, Negeri Sembilan
Also ask Lintang Tankworks for
- The PE calculation for your building.
- SPAN / IWK sewerage submission and resubmission.
- LT rental, 40 to 150 PE.